Project Description

Whatcom Environmental provided technical assistance to a fabrication facility leading to the issuance of a Conditional No Exposure exemption from the Washington State Department of Ecology Industrial Stormwater General Permit. The facility sought assistance at the very beginning of operations, and Whatcom Environmental was able recommend minor site management changes which allowed them to eliminate industrial stormwater pollution and avoid the ongoing costs associated with the permitting, monitoring, and reporting requirements.